Minister of Information, Culture and Tourism Muammar al-Eryani strongly condemned the horrific crime committed by the Iranian-backed Houthi terrorist militia, which resulted in the death of five children and injury to others in the al-Arsoom area of the al-Hashmah region in the al-Taziah district, northeast of Taiz Governorate over the explosion of a locally-made explosive device.
The death toll from the Israeli genocidal war on the Gaza Strip since October 7, 2023, has risen to 55,297, with 128,426 injured, the Ministry of Health in afflicted Palestinian enclave said. The majority of the victims are women and children.
U.S. President Donald Trump confirmed his intention to increase tariffs on foreign imports of steel and aluminum from 25% to 50%, which will increase pressure on steel producers worldwide and threaten to escalate his trade war.
Saudi Al-Hilal FC has been eliminated from the 2025 FIFA Club World Cup after suffering a 2-1 defeat to Fluminense FC from Brazil in the quarterfinals. The match was held at the Camping World Stadium in Orlando, Florida.
Marib hands over UNICEF locations for implementing six water projects
[29/12/2022 04:30]
MARIB-SABA
Marib Local Authority handed over UNICEF on Thursday locations for implementing six water projects in Madina and Hareeb Districts.
Costing 750 thousand USD, the projects are financed by King Salman Relief and Humanitarian Activities Center and more than 1.5 million people will benefit from them.
Handed over by Deputy Governor of Marib Abd-Rabbu Miftah, along with General Director of the branch of General Corporation for Water and Sanitation Hussein bin Jalal, the projects are distributed on the City District, which includes three projects; rehabilitating and expanding Al-Salam Neighborhood Water Project, implementing water network to al-Sharika Neighborhood, Assahn area and implementing water project for al-Sharikah Neighborhood, Assiyanah area.
While the other three projects will cover water projects of Harib District and include rehabilitating water network, main tank and expanding and rehabilitating the Pumping line.