[30/12/2021 01:28]
Aden - Saba
The sixth batch of oil derivatives grant provided by the Kingdom of Saudi Arabia through the Saudi Development and Reconstruction Program for Yemen arrived at the oil port in the temporary capital Aden, to operate power stations in the liberated governorates.
The fuel ship, carrying 60,000 metric tons of diesel, entered the oil port berth, and the sixth batch of the oil grant is scheduled to be completed in the coming days, with the arrival of about 30,000 metric tons of diesel to the oil port.
Upon the arrival of the ship, the technical teams and the competent authorities carried out the work of checking and inspecting the diesel material, and confirming its conformity with the approved specifications, in preparation for the start of the process of pumping fuel to the tanks designated for the oil grant in the Aden Refineries Company, and then carrying out the process of distributing the fuel in accordance with the approved procedures for power stations in Aden Governorate.
عضو مجلس القيادة العرادة يترأس اجتماعاً موسعاً للقيادات العسكرية في مأرب
طارق صالح: الحوثي يعيش ارتباكاً داخلياً والقبائل لن تكون إلا في صف الجمهورية
عضو مجلس القيادة الدكتور عبدالله العليمي يلتقي الرئيس الموريتاني
عضو مجلس القيادة الدكتور عبدالله العليمي يلتقي رئيس مجلس الوزراء وزير الخارجية القطري
وزير الخارجية يستعرض في فعاليات منتدى الدوحة تطورات الأوضاع في اليمن
رئيس مجلس النواب يزور اللواء 35 مدرع ومديريتي المواسط والشمايتين بتعز
افتتاح معرض صور بعنوان (هي عدن ..سطور وصور)
وزير الصحة يترأس اجتماعاً للجنة إعداد الاستراتيجية الوطنية للصحة 2026–2030
عضو مجلس القيادة الدكتور عبدالله العليمي يشارك في فعاليات منتدى الدوحة
ورشة عمل في عدن توصي بأهمية الإصلاحات الاقتصادية والدعم الكامل لخطتها المقرة